Recycling facility

[7] Electrical equipment

(v) Rotation speed control device

 

Rotation speed control device inspection
– Visual inspection
– Terminal looseness check
– Inverter inspection
(replacement of life-limited equipment parts)
– PLC inspection
(communication test, RAS check)
– Renewal of equipment
(inverter/PLC/control power supply)