Incineration facility

[11]Instrumentation equipment

(v) Automatic combustion controller (ACC)

 

ACC inspection
– Check of the combustion condition, optimization adjustment
– DCS communication test
– Fire grate control interlocking test
– Crane communication test
– Loop test for various air volumes and temperatures