Incineration facility

[11]Instrumentation equipment

(iv) Central monitoring device (DCS)

 

DCS inspection
– Operator station
– Control station
– Data base station
– Engineering station
– Dual system inspection
– Communication test
(crane/ACC/weighing machine)
– Control voltage check
– RAS function check
– PC inspection
– Replacement of life-limited equipment and parts
– Abnormal history investigation
– Startup check